JOBSITE WALK: FINAL STAGE MODERN-TRADITIONAL

temp-post-image

We are down to the final stages of the second project in Belle Meade! Last week I walked the project, and we are getting close! This is what we have been busy doing:

We have been under construction for the last 3 months, and details include:

-All new HVAC throughout, new units 14 SEER with 10-year parts warranty installed by Estes Heating and Air; NEST thermostats

-All new electrical, high-end light fixtures, and Audio-Visual system (integratable with iPad) throughout installed

-New plumbing in all bathrooms and main areas

-New appliances

-Complete renovation of all bathrooms, and kitchen with premium tiles, Italian marble, and Ceasarstone finishes

-Under the house was cleaned, and a new vapor barrier was installed.

-Pool was completely replastered and tiled. The pool equipment is in good condition, and new spa equipment was installed

-Frameless shower doors installed throughout, master has custom metal shower door

-New powder-coated railings installed at all stairs

-New modern custom cabinetry and finish carpentry moldings throughout

-Outdoor BBQ area brick work and outside fire pit constructed with Coyote grill and drawers

-Landscape lighting system installed to highlight front of property; additional landscaping placed at the front and back

-Emtek premium modern hardware throughout

-Interior and exterior paint

-Garage roof and under siding completely replaced; exiting roof in good condition

-Some exterior doors replaced as needed, new entry door and architectural details

-Converted front driveway

-Added brick mailbox

-New pluming pumps purchased from City of Belle Meade ($10K+)